Construction Calculators

🧱 Concrete Calculator

Results

Mix Ratio (Standard): 1 : 2 : 3 (Cement : Sand : Gravel)

🧱 Brick Calculator

Results

🎨 Paint Calculator

Results

🪟 Flooring Calculator

Results

🏠 Roofing Calculator

Results

💰 Material Cost Estimator

Enter unit prices to estimate total material costs based on your calculations above.

Material Quantity Unit Unit Price ($) Subtotal ($)
Concrete - m³ $0.00
Bricks - pcs $0.00
Paint - liters $0.00
Flooring - pcs $0.00
Roofing - pcs $0.00

Rough material quantities for common building jobs

These five calculators give first-pass quantities for a concrete slab or footing, a single-skin brick wall, painting the walls of a room, tiling or planking a floor, and covering a pitched roof. A sixth tab, the Material Cost Estimator, multiplies those quantities by prices you enter. The results are meant for budgeting and for sanity-checking a supplier’s quote — not for structural design or final ordering.

How to use it

  1. Open the tab for your job and choose Metric (m) or Imperial (ft). The unit switch applies to the room, wall, slab and roof dimensions; brick sizes and mortar stay in millimetres and tile sizes in centimetres.
  2. Fill in the dimensions. Optional fields such as mortar thickness, wastage, doors, windows, coats, tile size, tiles per box and pitch angle come with typical defaults you can change.
  3. Press Calculate. Clear empties the dimension fields, and Copy Results copies the result cards as text.
  4. After calculating one or more tabs, open Cost Estimator, type a unit price for each material and press Calculate Total Cost.

The assumptions behind each result

Concrete. Volume = length × width × depth (feet are converted with 1 ft = 0.3048 m), also shown in cubic yards. Weight assumes a density of 2,400 kg/m³, and that weight is split 1 : 2 : 3 into cement, sand and gravel as a rough guide — water is ignored and it is not a mix design. The bag count assumes each 40 kg bag of pre-mix yields about 0.012 m³; many products state a higher yield, so check the bag. A 10 m × 5 m slab 0.15 m deep is 7.5 m³ (about 9.81 yd³).

Bricks. Each brick covers its face plus one mortar joint: (length + joint) × (height + joint). With a standard 215 × 65 mm brick and a 10 mm joint that is about 59 bricks per m². The wastage percentage is then added. The page assumes a single-thickness wall and does not subtract openings, and its mortar volume is only a rough figure (wall area × joint thickness × 0.3).

Paint. Wall area = 2 × (length + width) × height, minus 1.9 m² per door and 1.4 m² per window. Paint = area ÷ 10 m² per litre × number of coats, also shown in US gallons. A 5 × 4 m room 2.8 m high with one door, two windows and two coats needs about 9.1 litres. Ceilings are not included.

Flooring. Tiles = floor area ÷ area of one tile, rounded up, then 10% is added for cuts and breakage and the result is divided by tiles per box. A 20 m² floor in 30 × 30 cm tiles needs 223 tiles, 246 with waste, or 23 boxes of 11.

Roofing. The sloped area is the footprint (length × width) divided by the cosine of the pitch angle, and the tile count assumes about 10 tiles per m². A 12 × 6 m footprint at 30° gives about 83 m² and 832 tiles. Overhangs, hips, valleys and ridge pieces are not counted.

Cost. Each subtotal is quantity × your unit price. Quantities are in m³ for concrete, litres for paint and pieces for the rest, even when you entered imperial dimensions, so enter prices per those units. The dollar sign is only a label; any currency works. Nothing you type is saved or sent anywhere — all the arithmetic happens in your browser.

Treat every figure as an estimate. Material yields, local building codes and site conditions vary, so confirm quantities with your supplier or a qualified builder or engineer before you buy materials or start structural work.

Frequently asked questions

How much extra material should I order?

The Bricks tab defaults to 5% wastage and the Flooring tab always adds 10%. Diagonal tile layouts, irregular rooms and fragile materials often need more, and it is common to keep a few spare tiles or bricks for future repairs.

Why is my roof area bigger than the building footprint?

A pitched roof is sloped, so its surface is longer than its horizontal projection. At 30° the surface is about 15% larger than the footprint; at 45° it is about 41% larger.

Can I use it for a flat roof or a wall with windows?

Yes, with care. Enter a pitch of 0 for a flat roof. For a brick wall with openings, subtract the openings yourself by reducing the wall length or height, because the Bricks tab uses the full wall area.

Do I need to calculate every tab before using the Cost Estimator?

No. Rows for materials you have not calculated keep a quantity of zero and add nothing to the total.